The dream of each Indian has the leg to have a train running towards Kashmir. Prime Minister Narendra Modi will inaugurate the final section of the Katra-Sangalda section of the Udhampur-Srinagar-Barramulla Rail Link (USBRL), a project of 272 km, tomorrow, on April 19, 2025. With the start of the connection of the vandagar vandagar vandagar vandagar vandagar Vandagar Valley and the restaurant of the vandagar connection. The Prime Minister, Narendra Modi, will mark this new semi-high train on April 19 (Saturday).
The section includes the iconic Railway bridge of Chenab, the highest rail arch bridge in the world, which allows the direct rail connectivity between New Delhi and Kashmira through Katra.
On April 10, Dilip Kumar, Executive Director of Information and Advertising of the Railway Board (ED/IP), highlighted the importance of the USBRL project of 272 kilometers (Udhampur-Srinagar-Barramulla Rail Link), which includes 119 kilometers.
He also said that the project is expected to increase connectivity, tourism and religious importance for the Kashmir region. This whole area is very important from the religious, tourist and connectivity point of view of Kashmir.
Read too: Katra-Srinagar Vande Bharat Train: Northern Railway announces trains schedules; Verify the rate, the route and other key details
Katra A Srinagar Vande Bharat Price to the train ticket
As Prime Minister Narendra Modi will mark the Vande Bharat Katra to the Srinagar train on April 19, it is expected that the reservation of tickets for the Katra train to Srinagar Vande Bharat begins soon. Although the final prices of tickets have not yet been officially announced, the estimated prices of inputs for the Katra train to Srinagar Vande Bharat are around 1,500-1,600 for AC CAR and RS 2.200-2500 for the executive chair car.
However, these prices are subject to the change of Indian railways announces official rates. Passengers can reserve online or offline tickets for Jammu and the Vande Bharat de Kashmira train.
How to book Katra to Srinagar Vande Bharat Ticket online?
To book a Katra train ticket to Srinagar in IRCTC, you must visit the IRCTC website. There, you must enter the details of your trips, including the origin (Katra), the destination (Srinagar), the travel date and the kind of preferred seats. Then, you must enter the details of your passenger and make the payment to confirm your reservation. Katra Bharat Express Vande to Srinagar, which will be launched on April 19, 2025, will reduce the travel time to 3 hours.
Katra A Srinagar Vande Bharat Train Time
According to Northern Railway, the Vande Bharat Express train is scheduled to start at 8.10 am and reach Srinagar at 11.20 AM The Vande Bharat train will begin at 7 pm from Delhi and will reach Srinagar at 8 am
The Katra-Sorinagar link of the Udhampur-Srinagar-Batamulla railway link (USBRL) was the most ambitious and difficult link of this project. Vande Bharat will depart from Srinagar at 12.45 pm and will arrive in Katra at 3.55 pm.
Prime Minister Modi to travel on this train
Prime Minister Modi is expected to travel on the train on this bridge as part of the inauguration. According to the report, the prime minister will then mark the first train to Kater from Katra to begin the operation of trains services between Katra and Baramulla and connected to Kashmira with the rest of the country.
Two Vande Bharat trains will be launched on April 19
On the day of its inauguration, two Vande Bharat Express trains will begin the service, one that goes from Srinagar and the other of Katra to Srinagar, said the executive director of the Railway Board.
Katra A Srinagar Vande Bharat Train to cross the world’s highest railway bridge
Railway officials said that stretching 1,315 meters through the Chenab River near the salary dam, the bridge has a wide arc range of 467 meters and can wind wind of up to 266 km / h. The bridge exceeds the eiffel tower in height and is almost five times higher than the QTUB mining from the river bed to the level of the rail.
The construction of this wonder of engineering involved more than 28,000 metric tons of steel. He introduced a first -child cable crane system, which was used to transport materials through a gorge of 915 meters wide with two huge cables and pylons that rise to about 100 meters high, they said.
The bridge is part of the USBRL project and connects “not only the land but the aspirations that send the Kashmir Valley to the rest of India with a reliable railway and for all climate.” The Ministry said it is the “highest rail bridge in the world” 359 meters above the river bed.